Experience

Selected Technical Experience & References

MIZAN is built on the experience of engineers and maritime professionals who have contributed to demanding marine, offshore and heavy-lifting projects.

The examples presented here reflect relevant technical experience behind the MIZAN team and help illustrate the type, scale and complexity of work that informs our approach today.

Engineering Track Record

Experience That Shapes How We Work

Before the formation of MIZAN, members of our team developed experience across marine structures, lifting systems and industrial equipment projects involving complex engineering, fabrication and integration requirements.

That background influences how we approach new work today — particularly in the early technical decisions that determine whether a concept can be manufactured, integrated and operated successfully.

Project Register

Selected Projects

The records below document selected experience associated with MIZAN’s engineering leadership and connected specialist work. Attribution is stated on every record.

P15 Jack-Up Barge

P15 Jack-Up Barge

Organization context
Hemco
Location
Qatar
Year
2020

Jack-up barge reference with a stated loading capacity of 400 tonnes SWL.

Loading capacity
400 tonnes SWL
Relevant MIZAN team contribution Engineering leadership experience
P24 Jack-Up Barge

BROS J900

Organization context
STFA
Location
Yalova, Türkiye
Status
Ongoing

BROS J900 jack-up barge reference with a 900-tonne loading capacity.

Loading capacity
900 tonnes
Dimensions
42 m × 24 m × 3 m
Flag
Türkiye
Classification
RINA
Relevant MIZAN team contribution Bro’s Crane engineering reference
P05 Jack-Up Barge

P05 Jack-Up Barge

Organization context
Dearsan
Location
Turkmenistan
Year
2016

Jack-up barge reference with a stated loading capacity of 200 tonnes and 14-metre legs.

Loading capacity
200 tonnes
Leg length
14 m
Relevant MIZAN team contribution Engineering leadership experience
P09 Floating Dock Crane

P09 Floating Dock Crane

Organization context
Sefine Shipyard
Location
Yalova, Türkiye

Floating-dock crane reference documented with two approved project figures.

Approved project figure
28 m × 45 t SWL
Approved project figure
40 m × 10 t SWL
Relevant MIZAN team contribution Engineering leadership experience
P01 Portal Slewing Crane

P01 Portal Slewing Crane

Organization context
Sefine Shipyard
Location
Yalova, Türkiye
Year
2024

Portal slewing crane reference documented with an approved project figure of 45 m × 60 t SWL.

Approved project figure
45 m × 60 t SWL
Relevant MIZAN team contribution Engineering leadership experience
P02 Portal Slewing Cranes

P02 Portal Slewing Cranes

Organization context
MTG DOLPHIN
Location
Varna, Bulgaria
Year
2024

Portal slewing crane reference documented with an approved project figure of 14 m × 40 t SWL.

Approved project figure
14 m × 40 t SWL
Relevant MIZAN team contribution Engineering leadership experience
P13 Crane Conversion & Walking System

P13 Tower Crane Walking System

Organization context
Sefine Shipyard
Location
Yalova, Türkiye
Year
2021

Walking system for conversion of a shipyard tower crane into a portal crane.

Relevant MIZAN team contribution Engineering leadership experience
P19 Portal Crane Conversion

P19 Portal Crane Conversion

Organization context
Desan Shipyard
Location
Istanbul, Türkiye
Year
2024

Pedestal, beams, legs and travelling mechanism for conversion of a marine deck crane into a portal crane.

Relevant MIZAN team contribution Engineering leadership experience
P03 Boat Travel Lift

P03 Boat Travel Lift

Organization context
Denta Shipyard
Location
Istanbul, Türkiye
Year
2008

Boat travel lift reference with a stated capacity of 450 tonnes SWL.

Capacity
450 tonnes SWL
Relevant MIZAN team contribution Engineering leadership experience

Capability Summary

Areas of Experience

  • Jack-Up Barges & Jacking Systems

    Elevated marine platforms, structural arrangements and leg and jacking systems.

  • Portal & Floating-Dock Cranes

    Slewing crane systems for shipyard, dock and floating-dock environments.

  • Heavy-Lift & Boat-Handling Equipment

    High-capacity equipment for vessel transfer and specialized lifting.

  • Crane Conversions & Special Marine Engineering

    Portal conversions, travelling mechanisms and tailored structural, mechanical and hydraulic solutions.

  • Marine Boom & Service Cranes

    Supporting breadth represented in the approved technical portfolio.

  • Hydraulic & Special Engineering

    Supporting breadth represented in the approved technical portfolio.

Experience Applied to New Challenges

The value of experience is not the project itself, but what it teaches about engineering decisions, manufacturing constraints and real operating conditions.

MIZAN brings that perspective into every new equipment requirement.

Discuss a Project